Half Cent Projects 2018-2019

Phases Facility Project Description
1. Planning PGES School Wide: HVAC Replacement
2. Design CES Bldgs. 1, 4, 5 & 6: Bldg Env Repairs w/Cafe Walkway Drainage
2. Design EES Bldg 4 Roof Replacement
2. Design Fac Ops HVAC
2. Design HHS Theater Renovation
2. Design Transportation (2) EHPA Generators
2. Design WHMS Bldg. 7: LED & Emergency Lighting / Ceilings
2. Design Endeavor Roof Replacement
2. Design SHS Theater Renovation
2. Design CES Roof Replacement
4. Construction CHS Exterior Lighting
4. Construction NCTHS Bldgs. 1, 2 & 7: Building Envelope Repairs
4. Construction WES Canopy & Lighting
4. Construction HHS School Wide: HVAC Replacement
4. Construction HHS Fire Alarm Replacement
4. Construction SHS Athletic Field Lighting Replacement
4. Construction WES Emer. & Exit Lighting Replacement
4. Construction County Wide FEMA generator replace nuts, bolts and paint
5. Close Out FCMS Multiple Buildings: Roof Replacement
5. Close Out PGES HVAC Chilled Water Piping Replacement
6. Warranty HHS Intercom System Replacement
6. Warranty WHMS School Wide: Egress Window Replacement
6. Warranty FacOps Thermal Insulation Replacement (Phase 1)
6. Warranty HHS Bldg. 24: Roof Replacement
6. Warranty JDFES School Wide: HVAC Replacement